This project started with a new high performance felt being laid, on a new roof deck, built up on a 200mm celotex based cold roof design.
The piers went up at the same time as the roof up to dpc hieght. The roof was then completed and the roof terrace started to take shape.
We built the piers first building in galvanised angle steel rails at set heights top and bottom. These were then clad in timber with an eye to making the whole construction have a soft feel to it.
The overall feel it that of a light and airy feel.
The project was completed in the summer of 2013.